Difference between revisions of "Xgubk00"

From Simulace.info
Jump to: navigation, search
(Object)
Line 7: Line 7:
  
 
= Object =
 
= Object =
Finding the minimum and maximum limits (time) for the Prague metro (Line C) which would reveal ideal spacing of each metro trains.
+
Finding the optimal number of shelters with optimal capacity to keep the number of residents safety.
Train should not stop in the tunnel due to waiting for the previous train (apart from exceptional cases). It should be reckon with the fact that metro station can’t be overfull.
 
  
 
= Global variables =
 
= Global variables =

Revision as of 23:52, 16 December 2014

Simulation should represent flood evacuation for the coast and people who lives there.

Assignment

  • Project Name: Flood evacuation
  • Author: Kristýna Gubišová
  • Software used: NetLogo

Object

Finding the optimal number of shelters with optimal capacity to keep the number of residents safety.

Global variables

  • Number of evacuated people
  • Number of shelters
  • Shelters capacity
  • Frequency of the flood

Outcome

Simulation should determine the shortest way to the shelter or out of the flood area and how many shelters should be available in flood area to keep residents safety.